Water Treatment Membrane Technology Pilot Study
Buford, GA
Client Name:
City of Buford
Project Type:
Water Distribution & Treatment
Services Provided:
Preliminary Engineering Report, Membrane Technology Pilot Testing
Water Treatment Membrane Technology Pilot Study
The new plant will be a full replacement of a conventional 2.5 MGD drinking water facility designed around the recommended membrane filtration system. The project includes additional finished water storage, a new operations and laboratory building, new backup power system, and an upgraded SCADA system. Projected construction cost $13.7 million.