
Peracetic Acid Study
This project studied the use of peracetic acid (PAA) as an alternative to chlorine at Kingstree’s wastewater treatment facility, addressing compliance issues

This project studied the use of peracetic acid (PAA) as an alternative to chlorine at Kingstree’s wastewater treatment facility, addressing compliance issues

This project involved safety and security upgrades, aging infrastructure replacements, and water quality monitoring improvements at a 0.80 MGD municipal wastewater treatment

This project involved the rehabilitation of several components at a 4.0 MGD municipal wastewater treatment facility, including equipment and piping replacement for

Keck + Wood analyzed the existing hydraulic water distribution models and identified pressure losses due to down surges in the system. They

Keck + Wood provided engineering services for the installation of a new 2.0 MGD Water Treatment Plant, including the preliminary engineering report,

Keck + Wood prepared the engineering report, design, construction documents, and cost estimates for expanding a surface water treatment plant in Thibodaux,

Buford’s Water Works, originally built in the 1930s and upgraded in 1964 and 1994, was facing operational challenges due to aging infrastructure.

Keck + Wood will prepare and submit a detailed Scope of Services that includes developing concept alternatives and reports, preliminary engineering and

Keck + Wood analyzed volumes collected in March 2023 (while schools were in session) to evaluate the potential for installation of a

The City of Loganville requested an access management and safety analysis for the US 78 Corridor, a principal arterial roadway serving the

Keck + Wood is assisting the City with its Lead Service Line (LSL) inventory, developing standard operating procedures in collaboration with the

Keck + Wood has delivered over $10 million in community spaces, streetscapes, and traffic engineering projects throughout the City of Monroe, revitalizing

The County may contract with one or more approved qualified consultants/firms to expedite future projects that may include transportation engineering, civil engineering,

Cherokee County is commissioning a corridor study for the 14.08-mile Old Highway 5 corridor, which spans five different agencies. Our team is

This project, identified as a priority during the Highway 278 Corridor LCI Process, connected Covington’s square to the Highway 278 commercial district

The Keck + Wood team was involved in various tasks, including screening potential intersections, analyzing operational improvements, and identifying the project delivery

This project consists of a 3-mile, 2-lane bypass around the north and east side of the City with 2-miles of roadway construction

The City of Winder received Operational Improvement Funds from GDOT to enhance traffic flow along SR 211/Athens Street, transforming it from a

A three-leg multi-lane roundabout was proposed at the intersection of Georgia State Route 61 and the Villa Rica Bypass to provide a

This project was programmed to address capacity constraints at peak hours, and will widen SR 21 with additional eastbound and westbound lanes,

Phase 1 consisted of 0.5 miles of concrete multi-use trail, including sections of wooden boardwalk and an asphalt parking lot at the

This project served as a key initiative to make Covington a more walkable city, connecting the downtown square to the commercial district

This project was programmed to address capacity constraints at peak hours, and will widen SR 21 with additional eastbound and westbound lanes,

Traffic data was collected for 19 intersections along the SR 141 corridor in Peachtree Corners, following GDOT Office of Planning methodology, with

The Old Highway 5 Corridor Traffic Study assessed traffic operations, safety, pedestrian/bicycle accessibility, and signal timing along a 14.08-mile stretch from the

This project involves upgrading three signalized intersections along Washington Road (SR 104) to meet current GDOT standards. Improvements include replacing existing strain

Keck + Wood is responsible for managing traffic signal timing and maintenance for 49 signals within the Gwinnett Place Community Improvement District

Keck + Wood currently serves Cherokee County as their Traffic Signal Warrant Study on-call consultant. At the request of the County, we